Case: A mobile battery energy storage and charging unit for electric construction machinery.
Challenge: Work zones change as a project progresses, so fixed chargers cannot always reach active equipment. Site power may also be insufficient for several machines charging at the same time.
Solution: Deploy the Door Energy MCP-A near excavators, loaders and site vehicles. The trailer combines 210kWh energy storage with up to 180kW DC output and can be relocated as the project moves.
Key Features:
Impact: Reduce travel to distant chargers, keep equipment closer to the work area and support phased electrification without installing a permanent charger at every location.